What is the construction process of climbing frame punching machine?

2023-08-31
second

Climbing frame punching machine The construction process of Punching machine The specific operation steps and sequence of.


Here is an example of a common construction process.


1. Preparation:

The construction personnel need to check the drawings and design requirements to understand the installation position and line direction of the punching machine.

Then, prepare the required tools and instruments, such as punching machine, screwdriver, level, etc.

At the same time, ensure site safety and take protective measures.


2. Mounting bracket:

According to the drawings and design requirements, determine the installation position of the punching machine on the overhead line.

Then, use a screwdriver to fix the bracket on the line, making sure the bracket is stable and perpendicular to the line.


3. Install the punching machine:

Place the punching machine on the pre installed support.

Fix and adjust the punching machine according to its installation mode.

Connect the punching machine to the bracket to ensure that the connection is firm.


4. Power on:

Connect the punching machine to the power supply through a cable.

Before connecting the power supply, check whether the power cord is damaged to ensure safety and reliability.

Then, insert the power cord into the power socket of the punching machine and turn on the power switch.


 Climbing frame punching machine


5. Debug punching machine:

Turn on the switch of the punching machine and observe its operation status.

Adjust the running speed, impact force and other parameters of the punching machine through the control panel or remote control.

At the same time, pay attention to the working condition of the punching machine to ensure its normal operation.


6. Punching operation:

When the punching machine is debugged, the construction personnel can start the actual punching operation.

According to the punching requirements, determine the size and number of holes at the location where the holes need to be punched.

Then, use a punching machine to punch holes on overhead lines.


7. Complete commissioning and testing:

After punching, check the punching hole diameter and position.

Use measuring instruments such as micrometers or laser rangefinders to measure the diameter and spacing of holes to ensure compliance with design requirements.

At the same time, quality inspection shall be carried out to check whether the punching machine operates normally and whether the hole quality is qualified.


8. Regular maintenance:

After using the punching machine, regular maintenance is required.

Clean the punching machine to remove dust and sundries. Check whether each part of the punching machine is damaged or loose, and repair and replace it in time.

Lubrication and commissioning shall be carried out regularly to ensure the normal operation of the punching machine.


To sum up, the construction process of climbing frame punching machine mainly includes the steps of preparation, installation of support, installation of punching machine, power on, commissioning of punching machine, punching operation, completion of commissioning and testing, and regular maintenance. Through these operations, the normal use of the punching machine on overhead lines can be ensured and the design requirements can be met. Of course, the specific construction process will be adjusted and changed according to the actual situation and requirements.

Recent browsing:

 Zinc steel guardrail punching machine

 1.png Mobile: 13679829857

 3.png Email: [email protected]

 4.png Address: Workshop 2, Baishaqiao Second Industrial Zone, Shishan, Nanhai District, Foshan City





Main business area: Guangdong Guangzhou Foshan Shenzhen Dongguan Zhongshan Zhuhai Huizhou Wuhan Shanghai